CONMIX Water Treatment has successfully designed, installed and commissioned a 100m3 per day Tertiary Water Filtration System at Khor Fakkan Port for the Labour Camp of our client, Gulftainer.
CONMIX CEO, Mr. Lothar Hellenkamp, on site inspection with former Water Treatment Division Operations Manager, Mr. Syed Ajaz Ali and the Group QHSE Manager of Gulftainer, Mr. Magimiraj.
Website:http://www.conmix.com
|